United States βΊ Grid βΊ Interconnection queues βΊ Ohio
BATTERY STORAGE Β· PJMMinster III ESS
Minster III ESS is a 19.9 MW battery storage request withdrawn in the PJM interconnection queue, in Auglaize County, Ohio, connecting to Dayton.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2016 (completed)
- Withdrawn / abandonedDec 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC1-212
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dayton
- Connection point (POI)
- Minster 69kV
- Location
- Auglaize County, Ohio
- Technology
- Battery: 19.9 MW
- Total requested
- 19.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 31 October 2016
- Proposed online date
- December 2020
- Withdrawn
- December 2020
Location
Marker shows the centre of Auglaize County; the queue data does not give exact sites.
Other requests in Auglaize County
- Onshore wind project AG2-452, Auglaize CountyOnshore wind Β· 300 MW Β· withdrawn
- Solar project AF1-113, Auglaize CountySolar Β· 180 MW Β· withdrawn
- Solar project AF1-085, Auglaize CountySolar Β· 77.0 MW Β· withdrawn
- Solar project AF2-059, Auglaize CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AG2-033, Auglaize CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AG1-025, Auglaize CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem