United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR Β· SOUTHEASTSolar project LGE-GIS-2020-001, Madison County
Solar project LGE-GIS-2020-001, Madison County is a 50.0 MW solar request withdrawn in the Southeast interconnection queue, in Madison County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2020 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LGE-GIS-2020-001
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Louisville Gas & Electric and Kentucky Utilities Energy
- Connection point (POI)
- Lake Reba - West Irvine Line Tap 161 kV
- Location
- Madison County, Kentucky
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- LGIA terminated
- Queue status
- Withdrawn
- Entered queue
- 2 October 2020
- Proposed online date
- December 2024
- Withdrawn
- November 2021
Location
Marker shows the centre of Madison County; the queue data does not give exact sites.
Other requests in Madison County
- Madison Solar 1Solar Β· 100 MW Β· in study
- Solar project AG2-073, Madison CountySolar Β· 53.0 MW Β· in study
- Solar project AF2-348, Madison CountySolar Β· 250 MW Β· withdrawn
- Solar project AF2-355, Madison CountySolar Β· 225 MW Β· withdrawn
- Solar project AI1-084, Madison CountySolar Β· 150 MW Β· withdrawn
- Solar project AE2-275, Madison CountySolar Β· 90.0 MW Β· withdrawn
- Solar project AH1-410, Madison CountySolar Β· 68.0 MW Β· withdrawn
- Solar project AG1-306, Madison CountySolar Β· 65.0 MW Β· withdrawn
- Solar project AF1-267, Madison CountySolar Β· 54.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem