United States β€Ί Grid β€Ί Interconnection queues β€Ί Alabama

SOLAR Β· SOUTHEAST

Solar project IC-1080, Walker County

Solar project IC-1080, Walker County is a 80.0 MW solar request withdrawn in the Southeast interconnection queue, in Walker County, Alabama, connecting to Southern Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2022 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
IC-1080
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Southern Company
Connection point (POI)
Fulton Springs - Gorgas No. 2 115 kV Line
Location
Walker County, Alabama
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
25 October 2022
Proposed online date
August 2026
Withdrawn
April 2025

Location

Marker shows the centre of Walker County; the queue data does not give exact sites.

Power plants in Alabama Β· Transmission lines in Alabama

Other requests in Walker County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem