United States βΊ Grid βΊ Interconnection queues βΊ Alabama
SOLAR Β· SOUTHEASTSolar project IC-1080, Walker County
Solar project IC-1080, Walker County is a 80.0 MW solar request withdrawn in the Southeast interconnection queue, in Walker County, Alabama, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2022 (completed)
- Withdrawn / abandonedApr 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-1080
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Fulton Springs - Gorgas No. 2 115 kV Line
- Location
- Walker County, Alabama
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 25 October 2022
- Proposed online date
- August 2026
- Withdrawn
- April 2025
Location
Marker shows the centre of Walker County; the queue data does not give exact sites.
Other requests in Walker County
- Battery storage project IC-1210, Walker CountyBattery storage Β· 150 MW Β· agreement signed
- Gas project IC-023, Walker CountyGas Β· 1,160 MW Β· withdrawn
- Gas project IC-147, Walker CountyGas Β· 85.0 MW Β· withdrawn
- Solar project IC-1105, Walker CountySolar Β· 80.0 MW Β· withdrawn
- Solar project IC-1081, Walker CountySolar Β· 80.0 MW Β· withdrawn
- Solar project IC-1106, Walker CountySolar Β· 80.0 MW Β· withdrawn
- Solar project IC-1108, Walker CountySolar Β· 80.0 MW Β· withdrawn
- Solar project IC-1104, Walker CountySolar Β· 80.0 MW Β· withdrawn
- Solar project IC-1107, Walker CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem