ONSHORE WIND Β· PJMOnshore wind project U2-017, Tazewell County
Onshore wind project U2-017, Tazewell County is a 200 MW onshore wind request withdrawn in the PJM interconnection queue, in Tazewell County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2008 (completed)
- Withdrawn / abandonedOct 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- U2-017
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Tazewell-Baileysville 138kV
- Location
- Tazewell County, Virginia
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 23 May 2008
- Proposed online date
- July 2011
- Withdrawn
- October 2008
Location
Marker shows the centre of Tazewell County; the queue data does not give exact sites.
Other requests in Tazewell County
- Battery storage project AH1-461, Tazewell CountyBattery storage Β· 80.0 MW Β· in study
- Solar project AH1-133, Tazewell CountySolar Β· 70.0 MW Β· in study
- Onshore wind project U2-071, Tazewell CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project S54, Tazewell CountyOnshore wind Β· 130 MW Β· withdrawn
- Solar project AC2-098, Tazewell CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project U2-050, Tazewell CountyOnshore wind Β· 100 MW Β· withdrawn
- Solar project AH1-173, Tazewell CountySolar Β· 16.7 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem