United States › Grid › Interconnection queues › Virginia

BATTERY STORAGE · PJM

Battery storage project AH1-461, Tazewell County

Battery storage project AH1-461, Tazewell County is a 80.0 MW battery storage request in interconnection study in the PJM interconnection queue, in Tazewell County, Virginia, connecting to AEP.

Queue statusIn planning
  1. PlanningQueued Feb 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AH1-461
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Developer
Lakeside Energy, LLC
Connection point (POI)
Buckhorn 138 kV
Location
Tazewell County, Virginia
Technology
Battery: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
20 February 2025
Proposed online date
December 2024

Location

Marker shows the centre of Tazewell County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Tazewell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem