United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AC2-098, Tazewell County
Solar project AC2-098, Tazewell County is a 100 MW solar request withdrawn in the PJM interconnection queue, in Tazewell County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2017 (completed)
- Withdrawn / abandonedAug 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC2-098
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Buckhorn-Lonesome Pine 138kV
- Location
- Tazewell County, Virginia
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 9 March 2017
- Proposed online date
- June 2018
- Withdrawn
- August 2017
Location
Marker shows the centre of Tazewell County; the queue data does not give exact sites.
Other requests in Tazewell County
- Battery storage project AH1-461, Tazewell CountyBattery storage Β· 80.0 MW Β· in study
- Solar project AH1-133, Tazewell CountySolar Β· 70.0 MW Β· in study
- Onshore wind project U2-071, Tazewell CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project U2-017, Tazewell CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project S54, Tazewell CountyOnshore wind Β· 130 MW Β· withdrawn
- Onshore wind project U2-050, Tazewell CountyOnshore wind Β· 100 MW Β· withdrawn
- Solar project AH1-173, Tazewell CountySolar Β· 16.7 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem