United States β€Ί Grid β€Ί Interconnection queues β€Ί Nebraska

ONSHORE WIND Β· SPP

Onshore wind project GEN-2016-064, Webster County

Onshore wind project GEN-2016-064, Webster County is a 116 MW onshore wind request withdrawn in the SPP interconnection queue, in Webster County, Nebraska, connecting to NPPD.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2016 (completed)
  2. Withdrawn / abandonedSep 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-064
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
NPPD
Connection point (POI)
Rosemont ring-bus station 115kv substation
Location
Webster County, Nebraska
Technology
Wind: 116 MW
Total requested
116 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 March 2016
Proposed online date
December 2017
Withdrawn
September 2017

Location

Marker shows the centre of Webster County; the queue data does not give exact sites.

Power plants in Nebraska Β· Transmission lines in Nebraska

Other requests in Webster County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem