United States βΊ Grid βΊ Interconnection queues βΊ Texas
BATTERY STORAGE Β· ERCOTRadian Storage II
Radian Storage II is a 320 MW battery storage request suspended in the ERCOT interconnection queue, in Brown County, Texas.
Queue statusPaused / redesign
- PlanningQueued Jul 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 26INR0518
- Grid region
- ERCOT (Texas)
- Location
- Brown County, Texas
- Technology
- Battery: 320 MW
- Total requested
- 320 MW
- Queue status
- Suspended
- Entered queue
- 29 July 2024
Location
Marker shows the centre of Brown County; the queue data does not give exact sites.
Other requests in Brown County
- Brookesmith StorageBattery storage Β· 351 MW Β· in study
- Mountaineer SolarSolar Β· 332 MW Β· in study
- Soluce Bravo StorageSolar + storage Β· 302 MW Β· in study
- Horseshoe Bend SolarSolar Β· 301 MW Β· in study
- Nouveau BESSBattery storage Β· 256 MW Β· in study
- Blanket Ranch North SolarSolar + storage Β· 189 MW Β· in study
- Wetzel BESSBattery storage Β· 186 MW Β· in study
- Chisme SolarSolar + storage Β· 147 MW Β· in study
- Chisme StorageSolar + storage Β· 146 MW Β· in study
- Coyote Ridge BESSBattery storage Β· 111 MW Β· in study
- Blanket Ranch South SolarSolar + storage Β· 101 MW Β· in study
- Soluce Bravo SolarSolar + storage Β· 80.5 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem