United States βΊ Grid βΊ Interconnection queues βΊ New York
BATTERY STORAGE Β· NYISOMarcy BESS 2
Marcy BESS 2 is a 195 MW battery storage request withdrawn in the NYISO interconnection queue, in Oneida County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-211
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- The Commodore Storage, LLC
- Connection point (POI)
- Volney - Marcy 345 kV
- Location
- Oneida County, New York
- Technology
- Battery: 195 MW
- Total requested
- 195 MW
- Queue status
- Withdrawn
- Entered queue
- 20 September 2024
Location
Marker shows the centre of Oneida County; the queue data does not give exact sites.
Other requests in Oneida County
- SunEast Skyline Solar LLCSolar Β· 20.0 MW Β· in study
- SunEast Flat Stone Solar LLCSolar Β· 20.0 MW Β· in study
- CommodoreBattery storage Β· 1,200 MW Β· withdrawn
- Marcy BESS 3Battery storage Β· 435 MW Β· withdrawn
- Snowy Knoll Wind ProjectWind + storage Β· 350 MW Β· withdrawn
- Field Day SolarSolar + storage Β· 300 MW Β· withdrawn
- Verona Solar Energy Center IISolar Β· 250 MW Β· withdrawn
- Verona Solar Energy Center ISolar Β· 250 MW Β· withdrawn
- North CreekSolar + storage Β· 200 MW Β· withdrawn
- Verona Solar ISolar Β· 199 MW Β· withdrawn
- Alder Creek SolarSolar Β· 165 MW Β· withdrawn
- Kce NY 36 LLCBattery storage Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem