United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTSolar project 25
Solar project 25 is a 74.5 MW solar request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2018 (completed)
- Withdrawn / abandonedMay 2019 (project stopped here)
- ConsentedMay 2019 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Seminole Electric Cooperative
- Connection point (POI)
- Seminole Generating Station/ Silver Springs North 230 kV
- Location
- Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: Feasibility; Status: Study Complete 05/14/19 Withdrawn by Customer on 5/31/2019
- Queue status
- Withdrawn
- Entered queue
- 17 October 2018
- Agreement signed
- 14 May 2019
- Proposed online date
- December 2020
- Withdrawn
- May 2019
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem