BATTERY STORAGE · NYISOGlen Head Battery Energy Storage System
Glen Head Battery Energy Storage System is a 20.1 MW battery storage request withdrawn in the NYISO interconnection queue, in Nassau County, New York, connecting to LIPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2022 (completed)
- Withdrawn / abandonedAug 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1387
- Grid region
- NYISO (New York)
- Utility / transmission owner
- LIPA
- Developer
- ClearCell Power
- Connection point (POI)
- 1 Stanco Street Substation via a dedicated feeder from the project site
- Location
- Nassau County, New York
- Technology
- Battery: 20.1 MW
- Total requested
- 20.1 MW
- Queue status
- Withdrawn
- Entered queue
- 9 June 2022
- Withdrawn
- August 2022
Location
Marker shows the centre of Nassau County; the queue data does not give exact sites.
Other requests in Nassau County
- Vineyard Mid-Atlantic WestOffshore wind · 1,321 MW · in study
- Glenwood Gas PlantGas · 79.9 MW · built
- Glenwood Gas PlantGas · 79.9 MW · built
- BrentwoodGas · 44.0 MW · built
- BrentwoodGas · 44.0 MW · built
- OW Ocean Winds East 3Offshore wind · 1,600 MW · withdrawn
- EI Empire ESS IIWind + storage · 1,440 MW · withdrawn
- Vineyard Wind IOffshore wind · 1,403 MW · withdrawn
- Bluepoint Wind 4Offshore wind · 1,382 MW · withdrawn
- Vineyard Mid-Atlantic 3Offshore wind · 1,330 MW · withdrawn
- Vineyard Mid-Atlantic 2Offshore wind · 1,330 MW · withdrawn
- NY Wind - New Bridge RoadOffshore wind · 1,325 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem