ONSHORE WIND Β· WESTOnshore wind project GI-0907, Todd County
Onshore wind project GI-0907, Todd County is a 100 MW onshore wind request withdrawn in the West interconnection queue, in Todd County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0907
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Developer
- Citizens Enterprises
- Connection point (POI)
- Mission 115kV
- Location
- Todd County, South Dakota
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- IAE/IAT
- Queue status
- Withdrawn
- Entered queue
- 9 February 2009
- Proposed online date
- November 2015
Location
Marker shows the centre of Todd County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Todd County
- Onshore wind project GI-0613, Todd CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project GI-0906, Todd CountyOnshore wind Β· 90.0 MW Β· withdrawn
- Onshore wind project GEN-2004-005N, Todd CountyOnshore wind Β· 30.0 MW Β· withdrawn
- Onshore wind project GI-0207, Todd CountyOnshore wind Β· 1.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem