Onshore wind project GEN-2017-113, Bennett County

Onshore wind project GEN-2017-113, Bennett County is a 119 MW onshore wind request withdrawn in the SPP interconnection queue, in Bennett County, South Dakota, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2017 (completed)
  2. Withdrawn / abandonedSep 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-113
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Martin 115kV
Location
Bennett County, South Dakota
Technology
Wind: 119 MW
Total requested
119 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
23 October 2017
Proposed online date
December 2021
Withdrawn
September 2022

Location

Marker shows the centre of Bennett County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem