United States › Grid › Interconnection queues › North Carolina

BATTERY STORAGE · SOUTHEAST

Battery storage project 567168, Mecklenburg County

Battery storage project 567168, Mecklenburg County is a 197 MW battery storage request in interconnection study in the Southeast interconnection queue, in Mecklenburg County, North Carolina, connecting to Duke Energy Carolinas.

Queue statusIn planning
  1. PlanningQueued Jun 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
567168
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Carolinas
Connection point (POI)
HARRISBURG TIE 230 kV
Location
Mecklenburg County, North Carolina
Technology
Battery: 197 MW
Total requested
197 MW
Service type
NRIS and ERIS
Study phase
Engineering Design
Queue status
Active
Entered queue
28 June 2022
Proposed online date
December 2029

Location

Marker shows the centre of Mecklenburg County; the queue data does not give exact sites.

Power plants in North Carolina · Transmission lines in North Carolina

Other requests in Mecklenburg County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem