United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
SOLAR Β· SPPSolar project GEN-2021-SR1, Seminole County
Solar project GEN-2021-SR1, Seminole County is a 81.6 MW solar request withdrawn in the SPP interconnection queue, in Seminole County, Oklahoma.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2021 (completed)
- Withdrawn / abandonedSep 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingOct 2022 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-SR1
- Grid region
- SPP (Southwest Power Pool)
- Location
- Seminole County, Oklahoma
- Technology
- Solar: 81.6 MW
- Total requested
- 81.6 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 5 February 2021
- Proposed online date
- October 2022
- Came online
- October 2022
- Withdrawn
- September 2021
Location
Marker shows the centre of Seminole County; the queue data does not give exact sites.
Other requests in Seminole County
- Gas project GEN-2024-321, Seminole CountyGas Β· 493 MW Β· in study
- Other project GEN-2025-SR10, Seminole CountyOther Β· 238 MW Β· in study
- Solar + storage project GEN-2024-360, Seminole CountySolar + storage Β· 160 MW Β· in study
- Other project GEN-2025-SR13, Seminole CountyOther Β· 130 MW Β· in study
- Gas project GEN-2000-014, Seminole CountyGas Β· 1,300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem