United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
GAS Β· PJMArchbald
Archbald is a 1.0 MW gas request built and operating in the PJM interconnection queue, in Wayne County, Pennsylvania, connecting to PPL.
Request details
- Queue ID
- D04
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Peckville 69kV
- Location
- Wayne County, Pennsylvania
- Technology
- Gas: 1.0 MW
- Total requested
- 1.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 26 May 2000
- Proposed online date
- June 2000
- Came online
- June 2000
Location
Marker shows the centre of Wayne County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Wayne County
- Solar project AH2-094, Wayne CountySolar Β· 5.0 MW Β· in study
- Solar project AF2-294, Wayne CountySolar Β· 17.0 MW Β· suspended
- Waymart WFOnshore wind Β· 70.0 MW Β· built
- WaymartOnshore wind Β· 13.0 MW Β· built
- Gas project AB1-151, Wayne CountyGas Β· 575 MW Β· withdrawn
- Onshore wind project AD2-152, Wayne CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project P45A, Wayne CountyOnshore wind Β· 120 MW Β· withdrawn
- Onshore wind project V3-042, Wayne CountyOnshore wind Β· 84.0 MW Β· withdrawn
- Onshore wind project Q02, Wayne CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Waymart Wind IIOnshore wind Β· 67.3 MW Β· withdrawn
- Onshore wind project AA2-069A, Wayne CountyOnshore wind Β· 64.6 MW Β· withdrawn
- Onshore wind project Y1-067, Wayne CountyOnshore wind Β· 64.6 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem