United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMSolar project AH2-094, Wayne County
Solar project AH2-094, Wayne County is a 5.0 MW solar request in interconnection study in the PJM interconnection queue, in Wayne County, Pennsylvania, connecting to PPL.
- PlanningQueued Jan 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AH2-094
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Lakeville 12 kV II
- Location
- Wayne County, Pennsylvania
- Technology
- Solar: 5.0 MW
- Total requested
- 5.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 31 January 2022
- Proposed online date
- May 2023
Location
Marker shows the centre of Wayne County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Wayne County
- Solar project AF2-294, Wayne CountySolar · 17.0 MW · suspended
- Waymart WFOnshore wind · 70.0 MW · built
- WaymartOnshore wind · 13.0 MW · built
- ArchbaldGas · 1.0 MW · built
- Gas project AB1-151, Wayne CountyGas · 575 MW · withdrawn
- Onshore wind project AD2-152, Wayne CountyOnshore wind · 150 MW · withdrawn
- Onshore wind project P45A, Wayne CountyOnshore wind · 120 MW · withdrawn
- Onshore wind project V3-042, Wayne CountyOnshore wind · 84.0 MW · withdrawn
- Onshore wind project Q02, Wayne CountyOnshore wind · 80.0 MW · withdrawn
- Waymart Wind IIOnshore wind · 67.3 MW · withdrawn
- Onshore wind project AA2-069A, Wayne CountyOnshore wind · 64.6 MW · withdrawn
- Onshore wind project Y1-067, Wayne CountyOnshore wind · 64.6 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem