United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
ONSHORE WIND Β· MISOOnshore wind project G332, Shawano County
Onshore wind project G332, Shawano County is a 80.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Shawano County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2003 (completed)
- Withdrawn / abandonedJul 2003 (project stopped here)
- ConsentedJul 2003 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G332
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Shawano County, Wisconsin
- Technology
- Wind: 80.0 MW
- Total requested
- 80.0 MW
- Queue status
- Withdrawn
- Entered queue
- 17 April 2003
- Agreement signed
- 14 July 2003
- Proposed online date
- June 2003
- Withdrawn
- July 2003
Location
Marker shows the centre of Shawano County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Shawano County
- Gas project G249, Shawano CountyGas Β· 110 MW Β· withdrawn
- Battery storage project J2537, Shawano CountyBattery storage Β· 100 MW Β· withdrawn
- Solar + storage project J1996, Shawano CountySolar + storage Β· 99.0 MW Β· withdrawn
- Solar project J2544, Shawano CountySolar Β· 95.0 MW Β· withdrawn
- Onshore wind project G333, Shawano CountyOnshore wind Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem