United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
BATTERY STORAGE Β· MISOBattery storage project J2537, Shawano County
Battery storage project J2537, Shawano County is a 100 MW battery storage request withdrawn in the MISO interconnection queue, in Shawano County, Wisconsin, connecting to AMERICAN TRANSMISSION COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2537
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMERICAN TRANSMISSION COMPANY
- Connection point (POI)
- Highway 22 345 kV Substation
- Location
- Shawano County, Wisconsin
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- December 2024
- Withdrawn
- July 2025
Location
Marker shows the centre of Shawano County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Shawano County
- Gas project G249, Shawano CountyGas Β· 110 MW Β· withdrawn
- Solar + storage project J1996, Shawano CountySolar + storage Β· 99.0 MW Β· withdrawn
- Solar project J2544, Shawano CountySolar Β· 95.0 MW Β· withdrawn
- Onshore wind project G333, Shawano CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Onshore wind project G332, Shawano CountyOnshore wind Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem