BATTERY STORAGE Β· PJM

Citron Storage

Citron Storage is a 3.0 MW battery storage request withdrawn in the PJM interconnection queue, in Wicomico County, Maryland, connecting to DPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2020 (completed)
  2. Withdrawn / abandonedJul 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AF2-249
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
DPL
Connection point (POI)
Edgewood 12 kV II
Location
Wicomico County, Maryland
Technology
Battery: 3.0 MW
Total requested
3.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
Queue status
Withdrawn
Entered queue
27 March 2020
Proposed online date
November 2023
Withdrawn
July 2024

Location

Marker shows the centre of Wicomico County; the queue data does not give exact sites.

Power plants in Maryland Β· Transmission lines in Maryland

Other requests in Wicomico County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem