ONSHORE WIND Β· PJMOnshore wind project R29, Knox County
Onshore wind project R29, Knox County is a 200 MW onshore wind request withdrawn in the PJM interconnection queue, in Knox County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2006 (completed)
- Withdrawn / abandonedJan 2010 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R29
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Kawanee 138kV
- Location
- Knox County, Illinois
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 24 October 2006
- Proposed online date
- December 2008
- Withdrawn
- January 2010
Location
Marker shows the centre of Knox County; the queue data does not give exact sites.
Other requests in Knox County
- Onshore wind project J844, Knox CountyOnshore wind Β· 300 MW Β· under construction
- Solar project J3498, Knox CountySolar Β· 300 MW Β· in study
- Onshore wind project J2938, Knox CountyOnshore wind Β· 200 MW Β· in study
- Battery storage project J3344, Knox CountyBattery storage Β· 100 MW Β· in study
- Solar project J3323, Knox CountySolar Β· 200 MW Β· withdrawn
- Onshore wind project J008, Knox CountyOnshore wind Β· 150 MW Β· withdrawn
- Solar project J3343, Knox CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project J887, Knox CountyOnshore wind Β· 75.0 MW Β· withdrawn
- Onshore wind project G694, Knox CountyOnshore wind Β· 62.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem