United States › Grid › Interconnection queues › Mississippi
SOLAR · MISOSolar project J2287, Bolivar County
Solar project J2287, Bolivar County is a 135 MW solar request in interconnection study in the MISO interconnection queue, in Bolivar County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
- PlanningQueued Sep 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2287
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- DELTA SES SWITCHYARD 115kV
- Location
- Bolivar County, Mississippi
- Technology
- Solar: 135 MW
- Total requested
- 135 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 7 September 2021
- Proposed online date
- December 2024
Location
Marker shows the centre of Bolivar County; the queue data does not give exact sites.
Power plants in Mississippi · Transmission lines in Mississippi
Other requests in Bolivar County
- Solar project J2751, Bolivar CountySolar · 125 MW · in study
- Solar + storage project J3186, Bolivar CountySolar + storage · 100 MW · in study
- Solar + storage project J3629, Bolivar CountySolar + storage · 210 MW · withdrawn
- Solar project J3541, Bolivar CountySolar · 150 MW · withdrawn
- Solar project J2768, Bolivar CountySolar · 120 MW · withdrawn
- Solar + storage project J3092, Bolivar CountySolar + storage · 115 MW · withdrawn
- Solar + storage project J2736, Bolivar CountySolar + storage · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem