SOLAR Β· MISOSolar project J2768, Bolivar County
Solar project J2768, Bolivar County is a 120 MW solar request withdrawn in the MISO interconnection queue, in Bolivar County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2768
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- Shelby SS - Roundaway SS (CE) 115 kV Line
- Location
- Bolivar County, Mississippi
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- September 2026
- Withdrawn
- July 2025
Location
Marker shows the centre of Bolivar County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Bolivar County
- Solar project J2287, Bolivar CountySolar Β· 135 MW Β· in study
- Solar project J2751, Bolivar CountySolar Β· 125 MW Β· in study
- Solar + storage project J3186, Bolivar CountySolar + storage Β· 100 MW Β· in study
- Solar + storage project J3629, Bolivar CountySolar + storage Β· 210 MW Β· withdrawn
- Solar project J3541, Bolivar CountySolar Β· 150 MW Β· withdrawn
- Solar + storage project J3092, Bolivar CountySolar + storage Β· 115 MW Β· withdrawn
- Solar + storage project J2736, Bolivar CountySolar + storage Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem