Solar project J865, St. Clair County

Solar project J865, St. Clair County is a 80.0 MW solar request withdrawn in the MISO interconnection queue, in St. Clair County, Michigan, connecting to ITC MIDWEST.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2017 (completed)
  2. Withdrawn / abandonedJan 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J865
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC MIDWEST
Connection point (POI)
Lee - Menlo 120kV Line
Location
St. Clair County, Michigan
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
16 June 2017
Proposed online date
September 2020
Withdrawn
January 2019

Location

Marker shows the centre of St. Clair County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in St. Clair County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem