United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

SOLAR Β· MISO

Solar project J1526, St. Clair County

Solar project J1526, St. Clair County is a 200 MW solar request withdrawn in the MISO interconnection queue, in St. Clair County, Michigan, connecting to ITC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2020 (completed)
  2. Withdrawn / abandonedSep 2024 (project stopped here)
  3. ConsentedJun 2023 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1526
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC
Connection point (POI)
Greenwood 345kV
Location
St. Clair County, Michigan
Technology
Solar: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA Complete; Post GIA Status: Withdrawn
Queue status
Withdrawn
Entered queue
14 June 2020
Agreement signed
20 June 2023
Proposed online date
May 2026
Withdrawn
September 2024

Location

Marker shows the centre of St. Clair County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in St. Clair County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem