Onshore wind project BHBE G9, Weston County

Onshore wind project BHBE G9, Weston County is a 250 MW onshore wind request withdrawn in the West interconnection queue, in Weston County, South Dakota, connecting to Black Hills Power.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
BHBE G9
Grid region
West (non-ISO utilities)
Utility / transmission owner
Black Hills Power
Connection point (POI)
Wyodak-Osage 230 kV
Location
Weston County, South Dakota
Technology
Wind: 250 MW
Total requested
250 MW
Service type
Network resource (NRIS)
Study phase
FSA not returned - deemed terminated
Queue status
Withdrawn
Entered queue
22 February 2010
Proposed online date
November 2012

Location

Marker shows the centre of Weston County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem