OTHER Β· MISOOther project G147, Iowa County
Other project G147, Iowa County is a 100 MW other request withdrawn in the MISO interconnection queue, in Iowa County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G147
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Iowa County, Wisconsin
- Technology
- Other: 100 MW
- Total requested
- 100 MW
- Queue status
- Withdrawn
- Entered queue
- 2 November 2001
- Proposed online date
- June 2003
Location
Marker shows the centre of Iowa County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Iowa County
- Onshore wind project J1781, Iowa CountyOnshore wind Β· 300 MW Β· under construction
- Onshore wind project J1483, Iowa CountyOnshore wind Β· 99.0 MW Β· agreement signed
- Onshore wind project J1931, Iowa CountyOnshore wind Β· 40.0 MW Β· in study
- Onshore wind project J712, Iowa CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem