United States βΊ Grid βΊ Interconnection queues βΊ Virginia
BATTERY STORAGE Β· PJMBattery storage project AH1-141, Henrico County
Battery storage project AH1-141, Henrico County is a 5.0 MW battery storage request withdrawn in the PJM interconnection queue, in Henrico County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-141
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Darbytown 230 kV
- Location
- Henrico County, Virginia
- Technology
- Battery: 5.0 MW
- Total requested
- 5.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 26 August 2021
- Proposed online date
- December 2024
- Withdrawn
- December 2024
Location
Marker shows the centre of Henrico County; the queue data does not give exact sites.
Other requests in Henrico County
- Solar project AG2-193, Henrico CountySolar Β· 20.0 MW Β· in study
- Spruance Operating Services LLCGas Β· 66.0 MW Β· built
- Darbytown GT4Gas Β· 20.0 MW Β· built
- Darbytown GT1Gas Β· 20.0 MW Β· built
- Darbytown GT3Gas Β· 20.0 MW Β· built
- Darbytown GT2Gas Β· 20.0 MW Β· built
- Briel Farm SolarSolar Β· 18.8 MW Β· built
- Richmond Energy FacilityOther Β· 8.0 MW Β· built
- Henrico County LandfillOther Β· 4.0 MW Β· built
- Briel Farm SolarSolar Β· 1.3 MW Β· built
- Solar project AD2-056, Henrico CountySolar Β· 20.0 MW Β· withdrawn
- Turner I SolarSolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem