United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· MISOOnshore wind project H080, Carroll County
Onshore wind project H080, Carroll County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Carroll County, Illinois.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2008 (completed)
- Withdrawn / abandonedOct 2008 (project stopped here)
- ConsentedOct 2008 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- H080
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- 161 kV line, approx 4 miles south of Savanna
- Location
- Carroll County, Illinois
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 24 June 2008
- Agreement signed
- 13 October 2008
- Proposed online date
- December 2010
- Withdrawn
- October 2008
Location
Marker shows the centre of Carroll County; the queue data does not give exact sites.
Other requests in Carroll County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem