United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
ONSHORE WIND Β· SPPOnshore wind project GEN-2017-241, Dawson County
Onshore wind project GEN-2017-241, Dawson County is a 10.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Dawson County, Nebraska.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2017 (completed)
- Withdrawn / abandonedJan 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2017-241
- Grid region
- SPP (Southwest Power Pool)
- Connection point (POI)
- Cozad 115kV Substation
- Location
- Dawson County, Nebraska
- Technology
- Wind: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 21 July 2017
- Proposed online date
- August 2018
- Withdrawn
- January 2019
Location
Marker shows the centre of Dawson County; the queue data does not give exact sites.
Other requests in Dawson County
- Hydro project GEN-2011-056B, Dawson CountyHydro Β· 4.5 MW Β· built
- Hydro project GEN-2011-056A, Dawson CountyHydro Β· 3.6 MW Β· built
- Hydro project GEN-2011-056, Dawson CountyHydro Β· 3.6 MW Β· built
- Coal project GEN-2001-040N, Dawson CountyCoal Β· 400 MW Β· withdrawn
- Onshore wind project GEN-2022-050, Dawson CountyOnshore wind Β· 272 MW Β· withdrawn
- Solar + storage project GEN-2022-172, Dawson CountySolar + storage Β· 140 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem