United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
SOLAR + STORAGE Β· SPPSolar + storage project GEN-2022-172, Dawson County
Solar + storage project GEN-2022-172, Dawson County is a 140 MW solar + storage request withdrawn in the SPP interconnection queue, in Dawson County, Nebraska, connecting to NPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2023 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-172
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- NPPD
- Connection point (POI)
- Canaday 230 kV Substation
- Location
- Dawson County, Nebraska
- Technology
- Solar: 140 MW Β· Battery
- Total requested
- 140 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 26 February 2023
- Proposed online date
- May 2027
- Withdrawn
- November 2023
Location
Marker shows the centre of Dawson County; the queue data does not give exact sites.
Other requests in Dawson County
- Hydro project GEN-2011-056B, Dawson CountyHydro Β· 4.5 MW Β· built
- Hydro project GEN-2011-056A, Dawson CountyHydro Β· 3.6 MW Β· built
- Hydro project GEN-2011-056, Dawson CountyHydro Β· 3.6 MW Β· built
- Coal project GEN-2001-040N, Dawson CountyCoal Β· 400 MW Β· withdrawn
- Onshore wind project GEN-2022-050, Dawson CountyOnshore wind Β· 272 MW Β· withdrawn
- Onshore wind project GEN-2017-241, Dawson CountyOnshore wind Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem