COAL Β· SOUTHEASTCoal project 1
Coal project 1 is a 750 MW coal request built and operating in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.
Request details
- Queue ID
- 1
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Seminole Electric Cooperative
- Connection point (POI)
- SGS Switchyard
- Location
- Florida
- Technology
- Coal: 750 MW
- Total requested
- 750 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: System Impact; Status: Complete
- Queue status
- Operational
- Entered queue
- 17 September 2003
- Proposed online date
- May 2012