πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Indiana

OTHER Β· PJM

Other project AF2-320, St. Joseph County

Other project AF2-320, St. Joseph County is a 48.0 MW other request withdrawn in the PJM interconnection queue, in St. Joseph County, Indiana, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2020 (completed)
  2. Withdrawn / abandonedSep 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AF2-320
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Dumont-Stillwell 345 kV
Location
St. Joseph County, Indiana
Technology
Other: 48.0 MW
Total requested
48.0 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
30 March 2020
Proposed online date
June 2023
Withdrawn
September 2020

Location

Marker shows the centre of St. Joseph County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in St. Joseph County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem