United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Brahman Solar

Brahman Solar is a 144 MW solar request withdrawn in the ERCOT interconnection queue, in Navarro County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2019 (completed)
  2. Withdrawn / abandonedJun 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0366
Grid region
ERCOT (Texas)
Developer
EC&R Development
Connection point (POI)
tap 345kV 68040 Kopperl - 68091 Navarro
Location
Navarro County, Texas
Technology
Solar: 144 MW
Total requested
144 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
7 July 2019
Proposed online date
June 2022
Withdrawn
June 2021

Location

Marker shows the centre of Navarro County; the queue data does not give exact sites.