United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMSolar project AF1-286, Bradford County
Solar project AF1-286, Bradford County is a 13.6 MW solar request withdrawn in the PJM interconnection queue, in Bradford County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2019 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF1-286
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- East Sayre 34.5 kV II
- Location
- Bradford County, Pennsylvania
- Technology
- Solar: 13.6 MW
- Total requested
- 13.6 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 30 September 2019
- Proposed online date
- February 2026
- Withdrawn
- September 2023
Location
Marker shows the centre of Bradford County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Bradford County
- Farmers Valley SolarSolar Β· 20.0 MW Β· agreement signed
- Gas project AI2-022, Bradford CountyGas Β· 60.0 MW Β· in study
- Solar project AG2-356, Bradford CountySolar Β· 20.0 MW Β· in study
- Solar project AH2-036, Bradford CountySolar Β· 5.0 MW Β· in study
- Liberty/Asylum Township PlantGas Β· 850 MW Β· built
- Armenia Mountain WFOnshore wind Β· 100 MW Β· built
- Liberty/Asylum Township PlantGas Β· 57.5 MW Β· built
- Beaver Dam Generating StationGas Β· 19.9 MW Β· built
- Wyalusing 34.5kVGas Β· 19.9 MW Β· built
- Glory Barn Road Generating Facility AlpacaGas Β· 19.9 MW Β· built
- North Tier LFOther Β· 1.6 MW Β· built
- Wyalusing 34.5 kVGas Β· 1.5 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem