HYDRO Β· SOUTHEASTHydro project 34, Newberry County
Hydro project 34, Newberry County is a 15.0 MW hydro request withdrawn in the Southeast interconnection queue, in Newberry County, South Carolina, connecting to Santee Cooper.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2012 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 34
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Location
- Newberry County, South Carolina
- Technology
- Hydro: 15.0 MW
- Total requested
- 15.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 24 January 2012
- Proposed online date
- January 2017
Location
Marker shows the centre of Newberry County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Newberry County
- Solar project 957146, Newberry CountySolar Β· 200 MW Β· in study
- Solar project 569164, Newberry CountySolar Β· 70.7 MW Β· in study
- Gas project 69, Newberry CountyGas Β· 1,212 MW Β· withdrawn
- Solar project 20171018001, Newberry CountySolar Β· 100 MW Β· withdrawn
- Solar + storage project 169, Newberry CountySolar + storage Β· 100 MW Β· withdrawn
- Solar project 67, Newberry CountySolar Β· 100 MW Β· withdrawn
- Battery storage project 957261, Newberry CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project 22142, Newberry CountySolar Β· 79.8 MW Β· withdrawn
- Solar project 22084, Newberry CountySolar Β· 79.8 MW Β· withdrawn
- Solar project 53, Newberry CountySolar Β· 75.0 MW Β· withdrawn
- Solar project 917941, Newberry CountySolar Β· 74.9 MW Β· withdrawn
- Other project 29, Newberry CountyOther Β· 55.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem