Solar project 569164, Newberry County

Solar project 569164, Newberry County is a 70.7 MW solar request in interconnection study in the Southeast interconnection queue, in Newberry County, South Carolina, connecting to Duke Energy Carolinas.

Queue statusIn planning
  1. PlanningQueued Jun 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
569164
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Carolinas
Connection point (POI)
Champion Bl 100 kV
Location
Newberry County, South Carolina
Technology
Solar: 70.7 MW
Total requested
70.7 MW
Service type
Network resource (NRIS)
Study phase
Engineering Design
Queue status
Active
Entered queue
24 June 2022
Proposed online date
December 2027

Location

Marker shows the centre of Newberry County; the queue data does not give exact sites.

Power plants in South Carolina · Transmission lines in South Carolina

Other requests in Newberry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem