Solar project AI1-044, Bedford County

Solar project AI1-044, Bedford County is a 7.5 MW solar request withdrawn in the PJM interconnection queue, in Bedford County, Pennsylvania, connecting to PENELEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2022 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AI1-044
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Breezewood 12.47 kV
Location
Bedford County, Pennsylvania
Technology
Solar: 7.5 MW
Total requested
7.5 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
13 May 2022
Proposed online date
May 2026
Withdrawn
September 2023

Location

Marker shows the centre of Bedford County; the queue data does not give exact sites.