United States › Grid › Interconnection queues › Oklahoma
BATTERY STORAGE · SPPBattery storage project GEN-2024-119, Cleveland County
Battery storage project GEN-2024-119, Cleveland County is a 199 MW battery storage request in interconnection study in the SPP interconnection queue, in Cleveland County, Oklahoma, connecting to WFEC.
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-119
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WFEC
- Connection point (POI)
- Lexington 138 kV Substation
- Location
- Cleveland County, Oklahoma
- Technology
- Battery: 199 MW
- Total requested
- 199 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 1 March 2025
- Proposed online date
- December 2028
Location
Marker shows the centre of Cleveland County; the queue data does not give exact sites.
Other requests in Cleveland County
- Battery storage project GEN-2022-154, Cleveland CountyBattery storage · 100 MW · in study
- Battery storage project GEN-2021-088, Cleveland CountyBattery storage · 100 MW · in study
- Gas project GEN-2000-005, Cleveland CountyGas · 825 MW · withdrawn
- Battery storage project GEN-2022-137, Cleveland CountyBattery storage · 200 MW · withdrawn
- Gas project GEN-2000-015, Cleveland CountyGas · 180 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem