ONSHORE WIND Β· MISOOnshore wind project J1177, Schuyler County
Onshore wind project J1177, Schuyler County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Schuyler County, Missouri, connecting to AMEREN TRANSMISSION COMPANY OF ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1177
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN TRANSMISSION COMPANY OF ILLINOIS
- Connection point (POI)
- Hughes 345 kV Switching Station (J541 POI)
- Location
- Schuyler County, Missouri
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- September 2020
- Withdrawn
- March 2020
Location
Marker shows the centre of Schuyler County; the queue data does not give exact sites.
Other requests in Schuyler County
- Solar project J4090, Schuyler CountySolar Β· 200 MW Β· in study
- Onshore wind project J541, Schuyler CountyOnshore wind Β· 400 MW Β· built
- Onshore wind project J682, Schuyler CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project G744, Schuyler CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project G448, Schuyler CountyOnshore wind Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem