United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

ONSHORE WIND Β· MISO

Onshore wind project G448, Schuyler County

Onshore wind project G448, Schuyler County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Schuyler County, Missouri.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2004 (completed)
  2. Withdrawn / abandonedAug 2005 (project stopped here)
  3. ConsentedAug 2005 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G448
Grid region
MISO (Midcontinent)
Connection point (POI)
Adair - Appanoose 161 kV
Location
Schuyler County, Missouri
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
3 September 2004
Agreement signed
29 August 2005
Proposed online date
October 2005
Withdrawn
August 2005

Location

Marker shows the centre of Schuyler County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Schuyler County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem