SOLAR + STORAGE Β· WEST

Solar + storage project Q84, Stevens County

Solar + storage project Q84, Stevens County is a 5.0 MW solar + storage request withdrawn in the West interconnection queue, in Stevens County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedFeb 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q84
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Chewelah 13kV
Location
Stevens County, Washington
Technology
Solar: 5.0 MW Β· Battery
Total requested
5.0 MW
Service type
Network resource (NRIS)
Study phase
Facility Study
Queue status
Withdrawn
Proposed online date
June 2026
Withdrawn
February 2024

Location

Marker shows the centre of Stevens County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Stevens County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem