United States β€Ί Grid β€Ί Interconnection queues β€Ί Idaho

ONSHORE WIND Β· WEST

Onshore wind project 563, Bonneville County

Onshore wind project 563, Bonneville County is a 950 MW onshore wind request withdrawn in the West interconnection queue, in Bonneville County, Idaho, connecting to Idaho Power Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
563
Grid region
West (non-ISO utilities)
Utility / transmission owner
Idaho Power Company
Connection point (POI)
Antelope 230kV Substation
Location
Bonneville County, Idaho
Technology
Wind: 950 MW
Total requested
950 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
23 August 2019

Location

Marker shows the centre of Bonneville County; the queue data does not give exact sites.

Power plants in Idaho Β· Transmission lines in Idaho

Other requests in Bonneville County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem