United States › Grid › Interconnection queues › Minnesota
BATTERY STORAGE · MISOBattery storage project J3703, Itasca County
Battery storage project J3703, Itasca County is a 200 MW battery storage request in interconnection study in the MISO interconnection queue, in Itasca County, Minnesota, connecting to MINNESOTA POWER INC..
- PlanningQueued Mar 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3703
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MINNESOTA POWER INC.
- Connection point (POI)
- Blackberry 230/115kV
- Location
- Itasca County, Minnesota
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Active
- Entered queue
- 25 March 2024
- Proposed online date
- June 2028
Location
Marker shows the centre of Itasca County; the queue data does not give exact sites.
Other requests in Itasca County
- Boswell Solar ProjectSolar · 86.8 MW · in study
- Coal project H092, Itasca CountyCoal · 60.0 MW · built
- Coal project G597, Itasca CountyCoal · 606 MW · withdrawn
- Coal project G519, Itasca CountyCoal · 600 MW · withdrawn
- Surplus; J1058Solar · 365 MW · withdrawn
- Gas project G800, Itasca CountyGas · 250 MW · withdrawn
- Other project G120, Itasca CountyOther · 225 MW · withdrawn
- Solar project J3863, Itasca CountySolar · 200 MW · withdrawn
- Onshore wind project J3237, Itasca CountyOnshore wind · 86.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem