Coal project G519, Itasca County is a 600 MW coal request withdrawn in the MISO interconnection queue, in Itasca County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2005 (completed)
- Withdrawn / abandonedMay 2013 (project stopped here)
- ConsentedDec 2007 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G519
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Blackberry 230/115kV Substation
- Location
- Itasca County, Minnesota
- Technology
- Coal: 600 MW
- Total requested
- 600 MW
- Study phase
- Optional
- Queue status
- Withdrawn
- Entered queue
- 19 May 2005
- Agreement signed
- 10 December 2007
- Proposed online date
- October 2006
- Withdrawn
- May 2013
Location
Marker shows the centre of Itasca County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Itasca County
- Battery storage project J3703, Itasca CountyBattery storage Β· 200 MW Β· in study
- Boswell Solar ProjectSolar Β· 86.8 MW Β· in study
- Coal project H092, Itasca CountyCoal Β· 60.0 MW Β· built
- Coal project G597, Itasca CountyCoal Β· 606 MW Β· withdrawn
- Surplus; J1058Solar Β· 365 MW Β· withdrawn
- Gas project G800, Itasca CountyGas Β· 250 MW Β· withdrawn
- Other project G120, Itasca CountyOther Β· 225 MW Β· withdrawn
- Solar project J3863, Itasca CountySolar Β· 200 MW Β· withdrawn
- Onshore wind project J3237, Itasca CountyOnshore wind Β· 86.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem