ONSHORE WIND Β· MISOOnshore wind project J3237, Itasca County
Onshore wind project J3237, Itasca County is a 86.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Itasca County, Minnesota, connecting to MINNESOTA POWER INC..
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3237
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MINNESOTA POWER INC.
- Connection point (POI)
- National Tac Plant 115kV (Customer-owned)
- Location
- Itasca County, Minnesota
- Technology
- Wind: 86.0 MW
- Total requested
- 86.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 9 April 2024
- Proposed online date
- June 2028
- Withdrawn
- July 2025
Location
Marker shows the centre of Itasca County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Itasca County
- Battery storage project J3703, Itasca CountyBattery storage Β· 200 MW Β· in study
- Boswell Solar ProjectSolar Β· 86.8 MW Β· in study
- Coal project H092, Itasca CountyCoal Β· 60.0 MW Β· built
- Coal project G597, Itasca CountyCoal Β· 606 MW Β· withdrawn
- Coal project G519, Itasca CountyCoal Β· 600 MW Β· withdrawn
- Surplus; J1058Solar Β· 365 MW Β· withdrawn
- Gas project G800, Itasca CountyGas Β· 250 MW Β· withdrawn
- Other project G120, Itasca CountyOther Β· 225 MW Β· withdrawn
- Solar project J3863, Itasca CountySolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem