United States › Grid › Interconnection queues › California

SOLAR + STORAGE · WEST

Solar + storage project Q68, Los Angeles County

Solar + storage project Q68, Los Angeles County is a 2,400 MW solar + storage request in interconnection study in the West interconnection queue, in Los Angeles County, California, connecting to Los Angeles Department of Water and Power.

Queue statusIn planning
  1. PlanningQueued Mar 2019 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2022 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
Q68
Grid region
West (non-ISO utilities)
Utility / transmission owner
Los Angeles Department of Water and Power
Connection point (POI)
Rinaldi-Victorville 500kV line
Location
Los Angeles County, California
Technology
Solar: 1,200 MW · Battery: 1,200 MW
Total requested
2,400 MW
Study phase
SIS completed. HS pending. FS pending.
Queue status
Active
Entered queue
26 March 2019
Proposed online date
June 2022

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem