United States › Grid › Interconnection queues › Oregon

ONSHORE WIND · WEST

NextEra Energy Resources

NextEra Energy Resources is a 100 MW onshore wind request withdrawn in the West interconnection queue, in Wasco County, Oregon, connecting to NextEra Energy Resources, LLC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2003 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G117
Grid region
West (non-ISO utilities)
Utility / transmission owner
NextEra Energy Resources, LLC
Developer
NextEra Energy Resources, LLC
Connection point (POI)
Big Eddy Substation at 230kV.
Location
Wasco County, Oregon
Technology
Wind: 100 MW
Total requested
100 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
31 July 2003
Proposed online date
December 2004

Location

Marker shows the centre of Wasco County; the queue data does not give exact sites.

Power plants in Oregon · Transmission lines in Oregon

Other requests in Wasco County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem