United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
SOLAR Β· SPPSolar project GEN-2023-031, Mclean County
Solar project GEN-2023-031, Mclean County is a 200 MW solar request withdrawn in the SPP interconnection queue, in Mclean County, North Dakota, connecting to WAPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-031
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Washburn 230 kV Substation
- Location
- Mclean County, North Dakota
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- October 2028
- Withdrawn
- March 2024
Location
Marker shows the centre of Mclean County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Mclean County
- Onshore wind project GEN-2025-GR3, Mclean CountyOnshore wind Β· 0.0 MW Β· in study
- Coal project G877, Mclean CountyCoal Β· 40.0 MW Β· built
- Coal project G876, Mclean CountyCoal Β· 25.0 MW Β· built
- Other project G119, Mclean CountyOther Β· 750 MW Β· withdrawn
- Onshore wind project MPC02600, Mclean CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project H084, Mclean CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem