United States › Grid › Interconnection queues › Oklahoma
BATTERY STORAGE · SPPBattery storage project GEN-2024-029, Logan County
Battery storage project GEN-2024-029, Logan County is a 150 MW battery storage request in interconnection study in the SPP interconnection queue, in Logan County, Oklahoma, connecting to OGE.
Queue statusIn planning
- PlanningQueued Oct 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-029
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- Crescent 138 kV Substation
- Location
- Logan County, Oklahoma
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 30 October 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Logan County; the queue data does not give exact sites.
Other requests in Logan County
- Gas project GEN-2013-012, Logan CountyGas · 147 MW · built
- Solar project GEN-2022-228, Logan CountySolar · 335 MW · withdrawn
- Solar project GEN-2018-127, Logan CountySolar · 200 MW · withdrawn
- Solar project GEN-2018-076, Logan CountySolar · 200 MW · withdrawn
- Battery storage project GEN-2022-230, Logan CountyBattery storage · 200 MW · withdrawn
- Battery storage project GEN-2022-229, Logan CountyBattery storage · 200 MW · withdrawn
- Solar project GEN-2022-231, Logan CountySolar · 166 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem